Space News & Blog Articles
ULA’s first mission with its Vulcan rocket may slide to January launch window
The debut of United Launch Alliance’s Vulcan rocket may slip from late December into early January, according to the company’s president and CEO, Tory Bruno. In a social media post on Sunday, Bruno said the planned Dec. 24 launch date is “likely out.”
The statement comes a couple days after the rocket conducted a Wet Dress Rehearsal (WDR), where the vehicle was fully fueled and went the countdown was to proceed to the final seconds before cutting off. But Bruno said a “couple of routine ground issues came up near the end” of the test.
Ground teams were targeting a T-0 of 4:30 p.m. EST on Friday. Based on observations of venting during the operation it appeared the countdown reached its final four minutes before an abort occurred. The Vulcan vehicle left the launch pad and returned to the Vertical Integration Facility building at launch complex 41 Saturday afternoon.
“I’d like a full WDR before our first flight, so [Christmas] Eve is likely out,” Bruno said in his post on X. He added that they are working on schedules but Spaceflight Now understands another test has been scheduled for as soon as Tuesday.
#VulcanRocket WDR update: Vehicle performed well. Ground system had a couple of (routine) issues, (being corrected). Ran the timeline long so we didn't quite finish. I'd like a FULL WDR before our first flight, so XMAS eve is likely out. Next Peregrine window is 8 Jan.
— Tory Bruno (@torybruno) December 10, 2023
The primary payload onboard is Astrobotic’s Peregrine lunar lander, which will journey to the Moon. If the launch is able to happen during the December launch window (Dec. 24-26), the lander would touch down on the Moon’s surface at approximately 3:30 a.m. EST (0830 UTC) on Jan. 25, 2024.
Bruno said that the next launch window based on Peregrine’s needs opens on Jan. 8, 2024 and would likely last for four days. Dan Hendrickson, Astrobotic’s Vice President of Business Development, told Spaceflight Now back in October that the nominal time from launch to landing is between 30 and 39 days. It was not immediately clear if there is a different transit time for the early January launch window.
Astrobotic’s Peregrine lunar lander in the clean room at Astrotech in Titusville, Florida. The spacecraft will be the main payload onboard the first launch of ULA’s Vulcan rocket. Image: ULAShifting Moon race
With the launch potentially shifting to January, that changes the landscape for Moon-bound missions. Liftoff on Jan. 8 would mean Peregrine would launch just four days before the opening of the launch window for Intuitive Machine’s Nova-C lander onboard a SpaceX Falcon 9 rocket.
The Japanese Aerospace Exploration Agency’s (JAXA) Smart Lander for Investigating Moon (SLIM) is also making its way to the Moon and is set to land around 1520 UTC on Jan. 19.
When you subscribe to the SpaceZE News Feed, we will send you an e-mail when there are new updates on the site so you wouldn't miss them.